-
Development and implementation of new specific test interfaces
(if necessary).
-
Adaptation of off-the-shelf interfaces to the TestFarm environment
(if necessary).
-
Wiring of the testing system.
-
Testing system configuration: integration of all the interfaces
and instruments.
-
Development of a self-test suite in order to perform maintenance
and diagnosis of the testing system.
Drafting of the Users & Verification Manual.
|
|
The setting up of a TestFarm automated test equipment adapted to your
application follows a rigorous process, going from the development of
specific test interfaces (if necessary) to the final configuration of
the system.
This stage can be supplemented by the training courses we offer.
|